Control File in new job
Posted: Fri Dec 21, 2007 2:46 pm
If I have a job opened with an assigned control file and I go to start a new job the new job has the same control file turned on. I have read on page 45 of the Reference Manual that in the Job Settings screen on the New Job tab that Attach Last Control Data will allow me to use the same control file on all new jobs. If I don't want a control for my new job and I do not have the Attach Last Control Data box checked, the way I read the manual is that I should not be having a control file on in the new job, that is not the case the control file is turned on in the new job. I have tried checking the Attach Last Control Data box and when I exit the Job Settings screen and then re-open Job Settings the box is not checked. Is this check box not working or do I have something wrong?