Page 1 of 1

Control Files W/ same pt #'s

PostPosted: Fri Apr 04, 2008 12:46 pm
by Mike Raba
I have recently switched to using a control file, if you have a control file attached, you can store the same point number as a completely different shot, Does anyone know how to have the Control File points have priority over the current job file. It should be a checkbox in the job settings screen. In the stake screen of job settings it has that option for control file points to have priority, but that does not help the issue of having two points with the same number (1 in the control file and 1 in the job file). Any ideas???? :? :?

PostPosted: Fri Apr 11, 2008 3:01 pm
by survtech
we have the same problem, any help would be great