Page 1 of 1

3D Length Stationing and pipe stakeout

PostPosted: Tue Mar 22, 2016 8:21 am
by topo
Hello,

I use Horizontal (.CL) and vertical alignement (.PRO) for a 20 Kms pipe project.
Is it possible to catch the 3D stationning (real length of le pipe) in survce

Thanks in advance

Re: 3D Length Stationing and pipe stakeout

PostPosted: Thu May 05, 2016 8:26 am
by topo
Hello guys !

Nobody can answer ?

Is it possible ? yes or no ?

Any pipe expert here ?

Thanks and best regards

Re: 3D Length Stationing and pipe stakeout

PostPosted: Fri Jun 05, 2020 3:31 pm
by tmist
following